PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed split wire at the 1st floor Facing North-East (800x600).jpg Installed split wire at the 2nd floor Facing North-East (800x600).jpg Installed top metal track at the 2nd floor at Rooms 205, 208 Facing West (800x600).jpg Installing gas pipes at the 1st Floor Facing West  (800x600).jpg Installing rebar at the 4th floor slab on deck Facing East (800x600).jpg Welded clips along the beam for the stone panels Facing South-West (800x600).jpg Welding clips along the beam for the stone panels Facing West  (800x600).jpg
Previous pageNext page Installed top metal track at the 2nd floor at Rooms 205, 208 Facing West (800x600)
Installed top metal track at the 2nd floor at Rooms 205, 208 Facing West (800x600)